The Residual Inhibitor Concentration (RSI) in the produced water phase of an offshore producing oil well in Norway, was closely approaching the critical Minimum Inhibitor Concentration (MIC).
Due to a one-month lead time for mobilizing scale inhibitor for the squeeze operation, the operator was in risk of having to shut the well in.
Read more in our Field Case (pdf).